Houston, TX  |  On-site hydrogen, nitrogen and zero air for laboratories
✆ 281-668-9154 | Sales@getsli.com
Free Lab Gas Readiness Assessment  ·  Hydrogen  ·  Nitrogen  ·  Zero air

What needs attention in your lab gas supply?

You may be adding instruments, reviewing cylinder costs or trying to explain a noisy baseline. Each calls for a different conversation about hydrogen, nitrogen or zero air. Pick the one on your list.

THE ASSESSMENT 4 TOPICS
  • 01  Compare the cost Both sides, line by line
  • 02  Check the capacity Flows by gas, with headroom
  • 03  Plan for an interruption Critical instruments first
  • 04  Troubleshoot the supply Five checks
Hydrogen Nitrogen Zero air
3 gasesHydrogen, nitrogen, zero air
4Topics to start from
20–25%Sizing headroom
$0The assessment
Where to start

Four places to look first

Most gas questions begin with one of these. Choose the one that matches your week.

01 / Cost

Compare the cost

Put delivery, handling, utilities and maintenance in the same calculation.

02 / Capacity

Check the capacity

Match gas flow to every inlet and detector, including planned additions.

03 / Backup

Plan for an interruption

Decide which instruments need backup and how long they need it.

04 / Troubleshoot

Troubleshoot the supply

Check pressure, gas specifications and service history alongside the instrument.

Basis: SLI’s October 2026 review of public forums, vendor pages and trade articles. It is not a survey.

Free Lab Gas Readiness Assessment

Let’s work through your setup

Tell us which topic is on your list. A Sales Engineer reviews your instruments, gases and current supply. Keep the plan whether or not you buy from us.

  • Gas itemization worksheet, emailed on submit
  • Written plan with sizing and headroom
  • Cost comparison and backup outline
  • Itemized quote alongside the plan
On screen the moment you submit

A short checklist of what to gather appears right away, and the worksheet follows by email.

Your information stays private. A Sales Engineer responds within 1 business day.

Request received

Thank you. A Sales Engineer will be in touch within one business day.

Here is the Lab Gas Readiness Checklist: the six things we will ask about, so your plan is right the first time.

  1. Every instrument that uses gas: model, and how many inlets and detectors.
  2. The gas each one draws, and its flow in cc/min or L/min (the worksheet we email you has columns for each).
  3. How you get gas today: cylinders, dewar or bulk, or generators, and what it costs you in delivery and handling.
  4. For nitrogen and zero air: is clean, oil-free, dry compressed air available at the generator location?
  5. Which instruments cannot be interrupted, and how many hours of supply each needs.
  6. Instruments you expect to add in the next two or three years.
✉  Lab Gas Itemization Worksheet: on its way to your inbox

Prefer to talk it through now? 281-668-9154

Questions, answered

Lab gas, straight answers

What do I get from the Lab Gas Readiness Assessment?
A gas itemization worksheet, emailed when you submit the form. Then a written plan covering your demand, sizing and headroom, compressed-air needs and a backup outline for critical instruments. Then an itemized quote. Keep them whether or not you buy from us.
Will a generator cost less than cylinders for my lab?
It depends on your usage, and the comparison can come out either way. We do not publish payback figures. We put delivery, handling, utilities and maintenance for both options into the same calculation, using your numbers.
How do you check the capacity for several instruments?
We total the flow of each gas across every inlet and detector, then leave 20 to 25 percent headroom and account for instruments you plan to add. For nitrogen and zero air we first ask about your compressed air, because it decides whether a compressorless unit works or you need a model with its own compressor.
Can nitrogen be my GC-MS carrier gas?
No. GC-MS carrier gas is helium or hydrogen. Nitrogen supports LC-MS, evaporators, ICP and GC makeup. Hydrogen is the usual replacement for helium carrier gas, and the assessment covers what that means for your gas supply.
What happens to my runs if the gas stops?
That is what the backup outline covers. We help you rank your critical instruments, record how long each needs gas, and quote reserve gas and power protection options. Your facility team and EHS own the final design.
Is hydrogen safe in my lab? Do I need a permit?
Requirements vary by jurisdiction and building, so check with your EHS team and the local fire authority early. Ventilation, leak detection and sign-off are theirs to decide. SLI shares best practices and does the sizing, specification, commissioning and training. Placement, plumbing and code approval stay with your facility.
Do you tell us how to change our GC method?
No. Each lab keeps its own methods and revalidates them. We share best practices that ease a helium-to-hydrogen transition and make sure the gas supply is sized and specified for what your instruments draw.
Can you look at generators we already own?
Yes. Troubleshooting the supply means reviewing pressure at the generator and at the instrument, the specification against what the instrument maker requires, total demand, service dates and the feed air. These checks sit alongside your own column, source and sample review. Tell us what you have when you submit the form.
Which areas do you serve?
SLI is based in Houston, TX and serves labs across a 20-state territory. If you are outside it, call us and we will say plainly what we can and cannot do.
Topics 1 and 2

Count both sides, then size it.

Payback depends on your usage, so we do not publish a figure. Here are the line items to count.

Cylinders and bulk

What to count
  • SupplyRental, delivery, hazmat fees, price changes
  • LaborChangeovers, storage and handling
  • RiskRuns lost when a cylinder empties mid-sequence
  • MarketHelium availability, if helium is still your GC carrier

On-site generator

What to count
  • PurchaseUnit, plus facility work for placement, plumbing and electrical
  • RunningPower, and deionized water for hydrogen
  • ServiceScheduled consumables and preventive maintenance
  • AirCompressed-air supply for nitrogen and zero air

Depending on how steadily you use gas, either option can come out ahead.

Checking the capacity

01 / Itemize

List every instrument, inlet and detector with the gas and flow it draws.

02 / Total by gas

Add the flows of each gas. GC-MS carrier is helium or hydrogen, never nitrogen.

03 / Leave headroom

Add 20 to 25 percent, plus instruments you expect to add.

04 / Ask about air

For nitrogen and zero air, is clean, dry, oil-free compressed air available at the generator location?

Topics 3 and 4

Plan for an interruption, and check the supply.

Plan for an interruption
  • Before: set the requirement Rank critical instruments; record how long each needs gas to finish a sequence and shut down properly
  • During: know the backup Know who decides and what each instrument does first when gas pressure drops
  • After: review what needs service Check service dates, replenish spares, update the plan

Review reserve gas and power protection with your facility and EHS teams. They own the final design.

Troubleshoot the supply: five checks
  • Pressure Generator outlet vs instrument inlet during a run
  • Gas specification Purity and dew point vs the manufacturer’s requirements
  • Total demand Flow across all connected instruments
  • Service history Filter, desiccant, catalyst and compressor intervals
  • Feed air Nitrogen and zero air: compressed-air quality

Use these alongside your column, source and sample review. Method parameters and revalidation stay with your lab.

For hydrogen, add your safety office

Involve your EHS team early. SLI shares best practices and does the sizing, specification, commissioning and training. Placement, plumbing and code approval stay with your facility.

What you receive

A worksheet, a plan, a clear next step.

One Sales Engineer works through your setup with you. The free assessment gives you three things.

1  A gas itemization worksheet

Emailed when you submit the form, so you can gather your instrument and gas-flow details.

2  A written plan

Your demand, sizing and headroom, compressed-air needs, and a backup outline for critical instruments.

3  An itemized quote

The proposed equipment and options, so you can see what is included.

Lab chemists and analysts

Check the supply, too

Five checks to review the gas alongside the column, source and sample when troubleshooting.

Lab managers

Numbers you can share

A line-by-line cost comparison from your own usage, and a backup outline you can show your director.

Project managers and facilities

Sized with room to grow

Total flows with headroom, the compressed-air answer, and the utility requirements your team needs.

Start with the topic on your list.

Tell us what is on your bench, and a Sales Engineer will write you a plan with an itemized quote.

✆ Request My Free Assessment →